CHANGE ORDER
Construction Contract Amendment
Change Order #
CO-2024-014
Date
23 Apr 2026
Project
Lot 47 Prospect Hill
Original Contract
$610,715.00
Contractor
Templeton Built
Owner
Sarah Gibson
Millwork upgrade — kitchen and butler's pantry. Custom cabinetry, quartz Level 3.
ItemAmount
Custom millwork — kitchen$8,400.00
Butler's pantry custom build$6,200.00
Quartz upgrade Level 1 → 3$3,850.00
Under-cabinet LED rough-in$640.00
Total Change$19,090.00
free.changeorderspro.com
// What's in the template

Every field you need on a real change order.

Built around the way US contractors actually work. Skip the generic legal-template fields you'll never fill in. Use the ones that matter.

Project & contract details

Project name, location, original contract value, contractor and homeowner details. The header that proves this is a real document.

Itemised cost breakdown

Line-by-line costs. Materials, labor, subcontractor fees broken out. Subtotals, overhead and profit, sales tax — all the math.

Schedule impact

Days added, new completion date, the reason. Most templates skip this. Skip this and you'll fight about it later.

Updated contract total

Original contract + this change order = new contract total. The number that matters most. Big and clear.

Signature blocks

Signature lines for both contractor and homeowner. Date fields. Printed name. The legal record of agreement.

Notes & justification

Free-text section for context — why this change was needed, what discussions led to it. The paper trail when memory fails.

// Or do this instead

The same template — but it sends itself in 30 seconds.

If you only do a few change orders a year, the template is fine. If you're doing a few a month — or a few a week — you're losing hours filling these in. Here's the same thing, digital.

ChangeOrdersPro is the template, in digital form.

Same fields. Same professional output. 30 seconds instead of 15 minutes. The client gets a branded email, signs from their phone, the contract updates automatically. You get the signed PDF emailed back. Done.

30 secvs 10–15 min
97%first-send approval
$03 free per month, forever

You also get:

  • Public signing portal — no app, no login for the client
  • Auto-calculated contract update on approval
  • Full audit trail — when viewed, when signed, from where
  • GPS-stamped photos attached to the change order
  • Approve / reject / query workflow
  • Both parties get the signed PDF emailed instantly
// Change order basics

What a change order is, and why it matters.

Quick reference for contractors who want to make sure they're handling change orders properly. Bookmark this — you'll use it more than you think.

What is a change order?

A change order is a written agreement between a contractor and a homeowner (or a subcontractor and a GC) that modifies the original contract. It documents what's changing, what it costs, how it affects the schedule, and gets signed by both parties.

Without a signed change order, you have no legal basis to bill for additional work. Verbal agreements get forgotten. Email chains get disputed. The change order is the document that keeps you paid.

When do you need one?

Any time the scope of work changes from what's in the original contract. Common triggers:

  • Homeowner requests an upgrade after walking the framed shell
  • Site conditions discovered during excavation
  • Plan errors or design changes
  • Material substitutions or unavailability
  • Code changes during construction
  • Trade conflicts requiring rework

The legal bit

Most US construction contracts (and the AIA standard contracts especially) require change orders to be in writing and signed before the additional work begins. Verbal change orders are generally unenforceable and a primary source of payment disputes.

Common mistakes to avoid

  • Doing the work first, billing later. If they don't sign before, they may not pay after.
  • Bundling multiple changes into one CO. If they reject part, they reject all. Send separately.
  • Skipping the schedule impact line. "It'll be fine" turns into a lawsuit when you're 3 weeks late.
  • Generic descriptions. "Misc. work" doesn't hold up. Itemise everything.
  • Not keeping a copy. Email gets lost. Store the signed PDF in two places.

Pricing a change order

Most builders use the same overhead and profit percentage they use on the base contract — typically 15-25%. Add sales tax on materials per state requirements. Be specific about what's included (rework? cleanup? final inspection?) and what's not.

Time-and-materials change orders should specify the hourly rate, the markup on materials, and whether you'll cap the total. Subs especially: write the cap.

Getting it signed quickly

The single biggest predictor of whether a change order gets signed is how quickly you send it after the conversation. Send within 24 hours of the verbal agreement and the approval rate is 95%+. Send a week later and it drops to 60%.

This is exactly why we built ChangeOrdersPro. The template takes 15 minutes — so it gets postponed. The digital version takes 30 seconds — so it gets sent now. Send-now beats send-later, every time.

// Common questions

Template FAQ.

Is this template legally binding?
When filled out completely and signed by both parties, yes. Change orders are contract amendments — the same legal status as the original contract once signed. We recommend you review the template with your attorney for compliance with your specific state's requirements before using it on a real project. The template provides a strong baseline structure, but legal advice is your responsibility.
Can I customise the template?
Yes — the Word and Excel versions are fully editable. Change the header to your logo, adjust the line item categories, modify the signature block. The PDF version is a fillable form, not a fully editable document. If you want to bulk-customise across multiple change orders, that's where the digital version makes sense.
What's the difference between this and the digital version?
The template is a document you fill out manually each time. The digital version is the same document, but the system auto-fills the project details, calculates totals, sends it for signature, tracks the audit trail, and updates your contract automatically. Same output, much less time. Free for your first 3 a month — most contractors never need to upgrade.
Do I need to give you my email to download?
For the PDF, no — direct download. For the Word and Excel versions, we ask for your email to send all 3 formats together. We'll send you occasional construction tips and product updates. Unsubscribe any time.
Can I use this template for commercial work?
It's designed for residential new construction and remodels. Commercial projects — especially anything using AIA standard contracts — usually require AIA Document G701 (the official commercial change order form). For residential work, this template is more than adequate.
Subcontractors — can I use this to bill my GC?
Yes. The template works in both directions — GC to homeowner, or sub to GC. You'll customise the parties, but the structure (scope, cost, schedule, signatures) is identical. Many subs use this exact template to issue T&M change orders to their GCs.